Aug. 25th, 2005

eor: (Default)
Part one of the next big chainmaille project is completed. 8,000+ little rings have been bent closed. Next is opening about 2,000 larger rings. With assembly, or knitting, being the final stage.

While poking around in the rings not yet used I discovered I had two pounds of bright aluminum rings already prepped for knitting. I'm not sure what I'm going to make with them, which is probably why they were left in that state. There might be enough there for a coif.

I also discovered I have six pounds of smaller bright aluminum rings (probably close to 50,000 rings). That's a lot of little rings. Again not sure quite how much I could make with it, but it's an impressive number of little circles.

Profile

eor: (Default)
eor

December 2025

S M T W T F S
 123456
78910111213
1415 1617181920
21222324252627
28293031   

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jan. 21st, 2026 08:38 pm
Powered by Dreamwidth Studios