Aug. 30th, 2020

eor: (vw)
Friday evening we did a brush burn so that the stacks we had piled up wouldn't get rained on again. It was exhausting after a long work week, but good to get done.

Yesterday was a wash out for outdoor work with steady rain most of the day. But that was predicted, so I spent most of the day in the barn working on organizing in there. I've now got a fair number of tools mounted on the french cleat system. Some of the flat surfaces are visible again. I also moved my now mobile miter saw bench to a better spot by the back window under the stairs. I'm not sure why I hadn't thought of that before, but it was probably because there was a refridgerator there before.

Today I spent most of the day working on the van. I disassembled the passenger side front suspension and started the process of reassembly. It's one of those jobs that can't be done all at once because it takes welding, so I have to disassemble, get things arranged, get the welding done, then reassemble. It will also take longer becuase I broke the brake line during the process, so now I have to replace that. That hard line was pretty sketchy and the flexible line above it is also pretty sketchy, so it's a good time to replace both. I hope I can get the disassembly of the other side done during the evenings this week, but getting much done in the evenings is getting harder as the days get shorter.

Profile

eor: (Default)
eor

December 2025

S M T W T F S
 123456
78910111213
1415 1617181920
21222324252627
28293031   

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Jan. 17th, 2026 06:25 pm
Powered by Dreamwidth Studios